Bringing buildings to life with reduced environmental impact
Please call 01344 874446

M&S – FM Plant Replacement Works

Facilities Management works at various store premises within the existing M&S Estate to survey, repair, refurbish or replace existing building services plant and equipment.

Key objective is to keep all stores operational – whilst ensuring compliance with all legislative requirements; and to provide a safe and comfortable environment for both customers and staff.

Read full case study

365,000sqft Distribution Centre

Project:

365,000sqft part chilled distribution center with 50,000 sq ft of office space and a comprehensive 12 bay vehicle maintenance unit.

Location:

Leyland – North West

Overview:

Designed to run with maximum energy efficiency and generate zero net carbon in operation with the construction of an energy centre
365,000sqft with circa 50% cold storage running at 500kVA
All systems have been designed to accommodate the future energy center
BREEAM rating: ‘Excellent’

Read full case study

Waitrose Stratford – BREEAM ‘Outstanding’

Project:

Waitrose Supermarket

Location:

Stratford City

Overview:

The key features of the building include:

  • Connection to Westfield’s Energy Centre resulting in a CO2 reduction
  • No use of traditional refrigerants
  • Water saving sanitary ware and technologies, such as sanitary supply shut-off valves, installed as standard specification
  • Free cooling in the form of cold air retrieval from the refrigerated cabinets used
  • An ‘A’ rated Energy Performance Certificate (EPC) – CO2 index of 24

Read full case study

Marlow Rowing Club

Marlow Rowing Club is located on the River Thames next to the town’s historic suspension bridge. The existing clubhouse was partly destroyed by fire in 2011 which also caused smoke damage to the rest of the building.

Read full case study

Blog