Synergy have been appointed by Inland Homes to design all M&E Services for the new project on the former site of Brooklands College
To maximise the best use of space the vertical and horizontal services have been meticulously planned and modeled in 3D
Energy use on site is kept to a minimum by utilising central boiler plant and incorporating on site renewable energy generation